
SAFe Practice Consultant Certified Official Practice Test SAFe-SPC - Sep-2024
Ace Scaled Agile SAFe-SPC Certification with Actual Questions Sep 04, 2024 Updated
Scaled Agile SAFe-SPC Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
NEW QUESTION # 51
An Iteration is a specific type of Plan-Do-Check-Adjust learning cycle.
- A. True
- B. False
Answer: A
NEW QUESTION # 52
How does a team calculate its initial velocity during its first PI Planning meeting when teams don't have
historic data?
- A. Assign 10 points per team member (not counting the Scrum Master and Product Owner) and subtract 1point for each holiday or vacation day.
- B. It is not recommended to calculate velocity until the team has completed its first PI.
- C. Assign 8 points per team member (not counting the Scrum Master and Product Owner) and subtract 1
point for each holiday or vacation day. - D. Allow teams to establish their own velocity and then roll them up to calculate the velocity of the train.
Answer: C
NEW QUESTION # 53
(Select 4) What are the 4 primary reasons why long queues are bad.
- A. More multitasking
- B. Higher variability
- C. Slower delivery
- D. Lower quality
- E. Decreased motivation
- F. Less cross-training
Answer: B,C,D,E
NEW QUESTION # 54
What role would a traditional program manager most likely take on in SAFe?
- A. Release Train Engineer or Value Stream Engineer.
- B. Product Manager
- C. Business Owner
- D. Scrum master
Answer: A
NEW QUESTION # 55
ARTs that consist only of Feature teams do not require an Architectural Runway.
- A. False
- B. True
Answer: A
NEW QUESTION # 56
What is the primary purpose of the management meeting at the end of Day 1 of PI Planning?
- A. To design the next generation of the product.
- B. To make adjustments to the PI scope and address program challenges.
- C. To assign business value to the teams' draft PI Objectives.
- D. To evaluate the performance of teams.
Answer: B
NEW QUESTION # 57
(Select 3) What are three ways to coordinate across Value Streams?
- A. Create a Portfolio Vision and Roadmap.
- B. Fund the Portfolio, not the Value Streams.
- C. Empower the Value Stream Engineer to coordinate all teams in the Value Stream.
- D. Establish Enterprise architecture.
- E. Move teams across Value Streams to respond to changing business demands.
- F. Apply cadence and synchronization.
Answer: A,D,F
NEW QUESTION # 58
What is the SAFe calculation for Weighted Shortest Job First?
- A. (User/Business Value + Time Criticality + Opportunity Enablement/Risk Reduction)/Job Size.
- B. (Risk Reduction/Opportunity Enablement + Time Criticality + Size)/Business Value.
- C. (User/Business Value + Size + Risk Reduction/Opportunity Enablement)/Job Size.
- D. (User/Business Value + Size + Risk Reduction/Opportunity Enablement)/Time.
Answer: A
NEW QUESTION # 59
(Select 2) What factors help unlock the intrinsic motivation of knowledge workers?
- A. Well-structured MBOs so people know exactly what's expected of them.
- B. Making a contribution.
- C. Ranking individuals for transparency in their contributions to the organization.
- D. Individual and team performance incentives.
- E. Autonomy.
Answer: B,E
NEW QUESTION # 60
(Select 2) What factors foster team "Ba"?
- A. Dunbar's number
- B. Built-in instability.
- C. Decentralized decision-making.
- D. Use of Feature Teams.
Answer: B,C
NEW QUESTION # 61
(Select 3) Which of the following have acceptance criteria?
- A. Business Capabilities
- B. Strategic Themes
- C. Program Epics
- D. Spikes
- E. Enabler Features
- F. Portfolio Enabler Epics
Answer: A,D,E
NEW QUESTION # 62
When does the System Demo happen?
- A. After Pre-PI Planning.
- B. After every Iteration.
- C. On demand.
- D. After the Solution Demo, but before PI Planning.
- E. After continuous integration.
Answer: B
NEW QUESTION # 63
What do Value Streams deliver?
- A. Cyber-physical systems
- B. Strategic Themes
- C. Solutions
- D. Agile Release Trains
Answer: C
NEW QUESTION # 64
A Program Epic requires budgetary approval and a lightweight business case only if it spans multiple PIs.
- A. False
- B. True
Answer: A
NEW QUESTION # 65
Where are Capabilities managed?
- A. In the ART Kanban.
- B. In the Value Stream planning board.
- C. In the Value Stream Kanban.
- D. In the Portfolio Kanban.
Answer: C
NEW QUESTION # 66
What should a Supplier using a traditional methodology do when working with ARTs in a Value Stream?
- A. Attend key Value Stream events.
- B. Develop her own Vision and Roadmap.
- C. Demonstrate working software at each Solution Demo.
Answer: C
NEW QUESTION # 67
What does the SAFe budgeting model suggest?
- A. Epics, Features, and Stories are funded based on their size in normalized Story points, while teams are
allocated to high-priority work as needed. - B. Each Value Stream receives budget allocation as a whole; individual work is not specifically budgeted.
- C. Each Strategic Theme receives a budget allocation when Strategic Themes span portfolios.
- D. Each team gets budget allocation and Features are funded according to their size in normalized Story points.
Answer: B
NEW QUESTION # 68
(Select 2) What are the 2 biggest reasons to reduce batch size?
- A. Produce less measurement overhead.
- B. Increase delivery reliability.
- C. Decrease stress on the system.
- D. Increase throughput.
- E. Make it easier to assess the state of smaller batches.
Answer: B,D
NEW QUESTION # 69
......
Try Free and Start Using Realistic Verified SAFe-SPC Dumps Instantly.: https://freetorrent.actual4dumps.com/SAFe-SPC-study-material.html